Excel guide · 4 min read
How to calculate board feet in Excel
=C2*D2*E2/144. A 1 x 6 inch walnut board 72 inches long is 3 board feet. With the length in feet, divide by 12 instead: =C2*D2*(E2/12)/12.Sample data
Every result on this page was calculated from this sheet by the same spreadsheet engine the Cellwise app uses.
| A | B | C | D | E | F | G | H | I | J | K | L | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Part | Species | Thick in | Width in | Length in | Qty | BF each | Species | Price per BF | Setting | ||
| 2 | Table top boards | Walnut | 1 | 6 | 72 | 5 | 3 | Red oak | 6.5 | Waste allowance (yours) | ||
| 3 | Aprons (long) | Walnut | 1 | 4 | 60 | 2 | 1.6666666667 | Walnut | 13.75 | Thickness as quarters | ||
| 4 | Aprons (short) | Walnut | 1 | 4 | 30 | 2 | 0.83333333333 | Hard maple | 7.25 | |||
| 5 | Legs | Hard maple | 2 | 2.5 | 29 | 4 | 1.0069444444 | |||||
| 6 | Shelf slats | Red oak | 1 | 3.5 | 58 | 6 | 1.4097222222 | |||||
| 7 | Stretchers | Red oak | 1 | 3 | 54 | 2 | 1.125 |
Download this sheet as an Excel practice file (.xlsx)
The board foot formula
One board foot is a piece 1 inch thick, 12 inches wide and 12 inches long: 144 cubic inches. So multiply the three sizes in inches and divide by 144. That's the formula in column G, filled down the cut list.
If your lengths are in feet, multiply thickness x width x length in feet and divide by 12. It's the same number: 1 x 6 x 6 ft / 12 = 3. Pick one unit for the whole sheet and put it in the header ("Length in"), because a mix of inches and feet in one column is the most common way to be off by 12 times.
Result: 3
3: one table top board, 1 x 6 x 72 inches.
Total board feet for the cut list
Each row is one part with a quantity, so the total is board feet each x quantity, added up. SUMPRODUCT does that in one cell. The whole project needs 34.74 board feet.
SUMIFS(G2:G7,B2:B7,"Walnut") is a common slip: it adds board feet per part and ignores the Qty column, giving 5.5 instead of 20. To total one species, multiply by the test inside SUMPRODUCT: =SUMPRODUCT(G2:G7*F2:F7*(B2:B7="Walnut")). Write it with * like that. If you pass the test as its own argument, =SUMPRODUCT(G2:G7,F2:F7,B2:B7="Walnut") returns 0, because SUMPRODUCT treats TRUE and FALSE as 0 in that form. Add -- in front of the test to fix it.
Result: 34.736111111
About 34.74 board feet for every part in the list.
Thickness: 4/4, 8/4 and finished vs rough
Hardwood is sold rough by the quarter inch: 4/4 ("four quarter") is 1 inch, 5/4 is 1.25, 8/4 is 2. Board feet use that rough thickness, not what's left after planing. The shelf slats finish at 3/4 inch but you buy 4/4 stock, so row 6 uses 1. Entering 0.75 would show 1.06 board feet per slat instead of 1.41, and you'd come home short.
If your list has thickness written as "8/4", convert it with LEFT and FIND: take the number before the slash and divide by 4.
Softwood dimension lumber is usually figured on nominal size. A 2x4 is really about 1.5 x 3.5 inches, but an 8-foot 2x4 is counted as 2 x 4 x 8 / 12 = 5.33 board feet, not 3.5. Most yards sell those by the piece or linear foot anyway, so ask how your yard prices.
Result: 2
2: "8/4" is 2 inches thick.
Add waste and round up to what you'll buy
Boards have checks at the ends, knots, defects and saw kerf, and the widths rarely match your parts. Put your waste allowance in an input cell (M2). 20% is only an example; people use more for knotty or rough stock and less for clear, straight boards.
Multiply by (1 + waste), then ROUNDUP to a whole board foot: 34.74 x 1.2 = 41.68, so plan for 42. Round up per species, since you buy each one separately: walnut 20 becomes 24, maple 4.03 becomes 5, red oak 10.71 becomes 13.
Result: 42
42 board feet to buy, including 20% waste.
Cost per board foot by species
Keep prices in a small table (species and price per board foot), then let SUMPRODUCT look up each row's price. XLOOKUP with a whole column of species returns one price per row (Excel 365 and 2021). In older Excel, SUMIF(I2:I4,B2:B7,J2:J4) does the same lookup.
The parts cost $373.81 at these prices before waste, about $448.57 with 20% added. For a shopping list per species, multiply the rounded-up board feet by the price: 24 walnut board feet at $13.75 is $330. Prices are examples; type in what your yard charges.
Result: 373.80555556 shows as $373.81 with Currency format
About 373.81: board feet x quantity x price for each part, added up.
Common mistakes
Using finished thickness
Use the rough thickness you buy (4/4 = 1 inch) even if the part ends up 3/4 inch thick.
Mixing feet and inches in the length column
Pick one unit, name it in the header, and divide by 144 (all inches) or 12 (length in feet).
Forgetting the quantity
SUMIFS on the board feet column ignores Qty. Use SUMPRODUCT with the Qty column in it.
Rounding each part before adding
Add the exact board feet, then add waste and ROUNDUP once per species.
FAQ
What is the formula for board feet?
Thickness x width x length in inches / 144. With length in feet, thickness x width x length / 12. Both give the same board feet.
How many board feet are in an 8-foot 2x4?
By nominal size, 2 x 4 x 8 / 12 = 5.33 board feet. The actual board is about 1.5 x 3.5 inches, which works out to 3.5, so check which one your supplier uses.
How do I convert linear feet to board feet?
For one thickness and width: linear feet x thickness x width / 12. A 1 x 6 board 10 linear feet long is 1 x 6 x 10 / 12 = 5 board feet.
How much extra wood should I buy?
It depends on the stock and your cut list. Put a waste percentage in its own cell, multiply by (1 + waste) and ROUNDUP, so you can change it after seeing the boards.
Functions used
SUMPRODUCTMultiply then addROUNDUPRounds away from zeroXLOOKUPModern lookup in any directionSUMIFAdds cells that matchSUMIFSAdds with several conditionsLEFTCharacters from the startFINDPosition of text (case-sensitive)
Related guides
- How to calculate cubic feet in Excel
- How to use SUMPRODUCT in Excel
- ROUND vs ROUNDUP vs ROUNDDOWN in Excel
- How to calculate cost per unit in Excel
- How to sum by day of the week in Excel
- Get the quarter from a date in Excel
- How to make negative numbers positive in Excel
Updated