Free construction estimate template

For contractors and remodelers who price jobs from a takeoff. Enter what you measured, a waste allowance and how much one sheet, box or can covers; the template rounds every order up to whole units and prices it. Add crew hours and your markup, and it gives you the quote price and the margin that markup really leaves you.

cellwise-construction-estimate-template.xlsxExcel workbook · 4.5 KB · works in Excel, Google Sheets, Numbers and LibreOffice · no signup
Download free template

Preview and try it

This is the template's sheet, calculated by the same engine as the Cellwise app. Change any number to see the formulas react before you download.

ABCDEFGH
1Job estimate
2JobBasement finish, 28 x 36 ft
3DateNov 2, 2026
4
5MaterialMeasuredUnitWasteCoverage per itemOrder qtyUnit costLine cost
6Drywall 1/2 in., 4x8 sheet1840sq ft0.12326515.981038.7
7Studs 2x4x8142each0.111574.25667.25
8Wall insulation (bag)860sq ft0.054023521196
9Vinyl plank flooring (box)1008sq ft0.1205648.52716
10Baseboard, 16 ft piece128lin ft0.116921189
11Wall paint (gallon), 2 coats3680sq ft0.053501238456
12
13
14LaborHoursRateLine cost
15Framing36582088
16Insulation1058580
17Drywall hang and finish64583712
18Flooring and trim22521144
19Painting30481440
20

How the formulas work

Order quantity in whole units

F6=IF(B6="","",ROUNDUP(B6*(1+D6)/E6,0))

Measured quantity plus waste, divided by what one item covers, rounded up. 1,840 sq ft of drywall plus 12% is 2,060.8 sq ft, or 64.4 sheets, so you order 65. Coverage is whatever the product label says: 32 sq ft for a 4 x 8 sheet, the square feet per box for flooring, 16 for a 16 ft piece of trim. Use 1 for items you count individually, like studs.

Line cost

H6=IF(F6="","",ROUND(F6*G6,2))

Order quantity times unit cost. Because it multiplies the rounded-up quantity, the estimate prices what you will actually buy, not the fractional amount you measured. Empty rows stay blank.

Markup on direct cost

H25=ROUND(H24*G25,2)

Direct cost (materials plus labor) times your markup in G25. Put overhead and profit in the markup, or add them as separate lines above if you want them visible. The quote price in H26 is direct cost plus markup.

The margin your markup really leaves

H27=IF(H26>0,H25/H26,0)

Margin is profit divided by the selling price, so it is always smaller than the markup: 25% markup gives a 20% margin. If you think in margins, set the markup in G25 to margin / (1 - margin), for example 33.3% for a 25% margin.

Make it yours

FAQ

How do I calculate materials with waste in Excel?

Multiply the measured quantity by 1 plus the waste percentage, divide by the coverage of one unit, and wrap it in ROUNDUP: =ROUNDUP(B6*(1+D6)/E6,0).

What is the difference between markup and margin?

Markup is profit as a percentage of cost; margin is profit as a percentage of the price. On a $1,000 cost with a $250 markup, the markup is 25% and the margin is $250 / $1,250 = 20%.

How do I add a ceiling or floor to the estimate?

Measure it as length x width in square feet and add it as its own line, with the coverage of the product you are using in the Coverage column.