Deck material takeoff and quote in Excel

Count boards and joists in whole pieces, price them and add your markup.

You will use: ROUNDUP, SUM, ROUND

Starting data

ABCD
1Deck length (ft)16
2Deck width (ft)12
3Board width plus gap (in)5.75
4Joist spacing (in)16
5Waste allowance0.1
6Markup on cost0.3
7
8Deck area (sq ft)
9Rows of 16 ft boards
10Joists
11
12ItemQtyUnit costCost
1316 ft deck boards32.5
1412 ft joists024.8
15Deck screws (box)346
16
17Quote price

Build it step by step

  1. Step 1

    Start with the deck area: length times width. Write it in B8.

    B8Formula included with Cellwise Plus
  2. Step 2

    Boards run along the 16 ft length, so the rows stack across the 12 ft width. Convert the width to inches and divide by the board width plus gap in B3, rounded up to whole rows. Write it in B9.

    B9Formula included with Cellwise Plus
  3. Step 3

    Joists run across the width, spaced along the 16 ft length. Count the spaces (length in inches / spacing, rounded up), then add 1 for the joist at the far end. Write it in B10.

    B10Formula included with Cellwise Plus
  4. Step 4

    How many boards to buy? Add the waste allowance in B5 to the rows in B9 and round up. Write it in B13.

    B13Formula included with Cellwise Plus
  5. Step 5

    Cost for each item is quantity times unit cost. Write it in D13, fill to D15.

    D13Formula included with Cellwise Plus
  6. Step 6

    Quote price: total cost with the markup in B6, rounded to cents. Write it in D17.

    D17Formula included with Cellwise Plus